Helicopter Build and Shop Notes Index
My construction log and general shop notes are kept in BLOG format. I can make a quick entry, and not have to do much formatting and then republish. Very fast. Not and much effort to keep a detailed log, sorted by date or tag.
From the list below you can select which specific topic is if interest, or the entire BLOG can be selected for viewing. Be careful with that option, though, as the size is quite large and that page may take a while to load.
show
show
show
show
show
show
show
show
show
show
show
show
show
show
show
show
show
show
show
show
All log entries from most recent backwards in time. Sorted only by date. LARGE - long load time.
General shop and kit notes. Equipment and tool data. Shop techniques.
Preparing, finishing, and mounting seat pan to frame.
General Seat/Cabin/structure building. The body of the helicopter.
Construction, jigging, and finishing of vertical and horizontal fins.
Cabin cutting, fitting, finishing, and installation. Lots of fiberglass work.
Fitting and carefully drilling and mounting windscreens.
Mounting Instrument Pod, Developing panel, wiring and general avionics work.
General Electrical work. This includes everything not specifically related to the instrument panel.
Painting and finishing techniques, materials, and execution.
Work related to tail rotor mounting and fitting
Main rotor head work (nothing yet)
Prepping, finishing, mounting and balancing main rotors
Pedals, cables, fittings, and rigging of Tail Rotor controls.
Collective and throttle controls.
Cyclic controls form stick to rotor head
Tanking, plumbing, pumping, and instrumenting the fuel system
Mounting of the main transmission, tail rotor shaft, and tail rotor gearboxes.
Everything engine related.
Me flying helicopters. Gotta make sure I will be able to fly this machine when complete.